Home / Moisture testing and floor preparation
Every floor we lay starts with the slab. We test moisture, check flatness and prepare the substrate before anything goes down, so the floor carries its warranty and stays down.
Most flooring failures don’t start with the flooring. They start with the slab: moisture still coming out of the concrete, an uneven surface, or a weak, contaminated top layer. Adhesives lose their bond, vinyl lifts or bubbles, and timber cups or gaps. Fixing it after handover means pulling up a finished floor.
We treat floor preparation as part of the flooring package, not an extra. It’s tested, priced and agreed up front, so it doesn’t turn into a surprise variation halfway through the program.
Our testing follows AS 1884:2021, the Australian Standard for installing resilient floor coverings, together with each manufacturer’s own moisture and flatness limits. If a floor won’t meet the manufacturer’s requirements, we tell you before it goes down.
Moisture becomes a known quantity before the program is locked in, not a problem discovered on install day.
Slabs tested as soon as we have access, so results are in hand while there’s still time to act on them.
Results recorded and shared with the builder, with any area outside tolerance flagged.
Grinding, levelling or a moisture barrier priced and agreed before work starts.
The substrate prepared area by area to the builder’s program.
Flooring installed to the manufacturer’s requirements, then protected through to handover.
From slab grinding in new apartment towers to moisture barriers in buildings next to operating communities.
In delivery
Manly, Brisbane
Retirement apartments on the heritage Lota House site, built alongside an operating aged care community.
Image: FKG Group
Completed
Robina, Gold Coast
A multi-level fitout of TAFE Queensland’s newest campus, recognised as Australia’s first sustainable vocational education and training campus. Commercial training kitchens, hair and beauty studios, lecture rooms, a gym, classrooms, and a conference and bar level for events.
Image: Shape Australia
Completed 2024
Indooroopilly, Brisbane
Two boutique residential buildings with a rooftop pool and terrace overlooking the river and city.
Photo: Mosaic Property Group
It depends on the slab’s thickness and mix, how it was cured, and site conditions such as airflow and air-conditioning. Rules of thumb are only a rough guide, so the reliable answer is a moisture test. We test early so the program can be planned around the result.
AS 1884:2021 sets out installation practices for resilient floor coverings such as vinyl and linoleum, including how the substrate is tested for moisture. Flooring manufacturers also set their own moisture and flatness limits, and meeting them is what keeps the floor under warranty.
If the program allows, the slab is given more time to dry and re-tested. If it doesn’t, we apply an Ardex moisture barrier under the levelling compound, so the whole substrate is one Ardex system with a single system warranty. It’s priced for approval before any work goes ahead.
Yes. Engineered timber, hybrid and laminate manufacturers all set moisture limits for the subfloor, and direct-stick timber is especially sensitive to moisture in the slab. We test before every timber, hybrid and resilient floor we install, not just vinyl.
Send the drawings, finishes schedule and program to our estimating team. We’ll come back with an itemised price and any clarifications.