Home / Concrete slab moisture testing
Concrete slab moisture testing Brisbane & South East Queensland
Laying timber, hybrid, vinyl or tiles over a concrete slab? Moisture coming up through the slab is the most common cause of flooring failure: lifting, cupping, bubbling, mould and failed adhesive. In most cases the slab looks dry on the surface, so you can’t see the problem until it’s too late.
We test the slab properly, to the Australian Standard, before you spend money on new floors.
Who it’s for.
A moisture test tells you whether the slab is ready for a new floor, before the floor goes down and while the fix is still simple.
Most flooring and adhesive manufacturers set a maximum slab moisture level. If the slab wasn’t tested, a failed floor is rarely covered by warranty.
- Homeowners and renovatorsGarage conversions, downstairs rooms and granny flats, especially on slabs cut into a slope or under an older house.
- Before new flooringTimber, engineered timber, hybrid, laminate, vinyl plank, sheet vinyl and tiles.
- Problem floorsLifting or cupping boards, musty smells, white powder on the slab, or flooring that has already failed.
- Builders and developersPre-installation testing on new and existing slabs, with the records your project needs. See below.
How we test.
We use the in-situ relative humidity (RH) probe method, the primary test method in AS 1884:2021, with calibrated Protimeter equipment.
Visit 1: set up
We drill small test holes into the slab, insert and seal probe sleeves, and mark each location on a plan.
Wait at least 24 hours
The air in each sealed hole settles to match the moisture in the slab. AS 1884:2021 requires a minimum of 24 hours before results are recorded.
Visit 2: readings
We take the RH and temperature readings at each test point, with photos of each reading.
Your report
A written report with the results, a marked-up test location plan, photos and a clear pass or fail against the 80% RH limit.
The number of test points follows the Standard: three for the first 100 m², plus at least one for each additional 100 m².
Why not a quick meter reading? Surface moisture meters only read the top few millimetres of the slab. They’re useful as a rough guide but not as a test. The Standard calls for in-situ probes because the moisture that causes failures is deeper in the slab.
Book a moisture test.
Tell us about the slab and we’ll call you within one business day with a fixed-price quote.
Every test gets a fixed price before we start, based on the area and the number of test points. There’s no travel charge within 100 km of our Underwood base.
Plans or photos help us price it accurately, but they’re optional.
Prefer to talk? Call 07 3462 2715, Monday to Friday, 7:00am to 3:30pm.
Real readings from slabs we’ve tested.
In-situ probe readings from recent jobs: apartment buildings, a supermarket and family homes. They range from 89% to 98% RH, and every one is over the 80% RH default limit in AS 1884:2021. None of these slabs looked wet on the surface.
What if the slab fails?
You’ll know exactly where you stand. If readings are above the limit, the slab needs a moisture barrier system before any floor covering goes down.
We can quote to supply and install a complete barrier and levelling system that’s warranted by the manufacturer, leaving the slab ready for whatever floor you choose. See floor preparation and moisture barriers.
You’re under no obligation to use us for the fix. The report is yours to use with any builder or flooring installer.
Why Briz Floors.
- Licensed commercial flooring contractor, QBCC licence 1304150
- Testing to AS 1884:2021, the Australian Standard for resilient floor installation
- We test slabs for builders on commercial, education, retail and apartment projects every week
- We fix what we find: moisture barriers, screeds and levelling, as one warranted system
- No travel charge within 100 km of our Underwood base
For builders and developers.
Testing before floor covering installation protects your program and your defects period.
- Pre-installation testingRH testing on new and existing slabs, per floor or per area.
- Complete recordsTest records that cover what AS 1884:2021 requires: locations, date and time, readings, equipment and calibration.
- Clear direction optionsIf readings are high, written direction options, so it’s a managed decision and not a dispute.
- Defined mitigation rateMoisture mitigation priced as a defined variation rate.
Common questions.
How long does a moisture test take?
Two visits at least 24 hours apart. The setup visit is usually under an hour. Your report is released 2 to 3 business days after the second visit, once the invoice is paid.
How much does a moisture test cost?
Every test gets a fixed price before we start, based on the area and the number of test points the Standard requires. There’s no travel charge within 100 km of our Underwood base. Send us the details for a fixed-price quote.
Do I need a moisture test before laying hybrid or timber flooring?
If you’re laying over a concrete slab, especially an older slab on the ground, yes. Most flooring and adhesive manufacturers set a maximum slab moisture level, and a failed floor is rarely covered by warranty if the slab wasn’t tested.
What is the acceptable moisture level for a concrete slab?
AS 1884:2021 sets 80% relative humidity as the default limit for resilient floor coverings. Some products set a lower limit, and the manufacturer’s limit applies where it’s stricter.
My slab looks dry. Can it still have a moisture problem?
Yes. Slabs on the ground, slabs cut into a slope, and slabs without an effective damp-proof membrane can stay wet for years, even when the surface feels dry.
Will drilling damage my slab?
The test holes are small. We seal them after testing, and they’re covered by the new floor.
What happens if the slab fails?
A moisture barrier system goes down before the new floor. We can quote for it, or you can use the report with your own builder or installer. See floor preparation and moisture barriers.
Is your report independent?
We’re a flooring contractor, and we may also quote to fix the slab. We say that up front in every report. If you’d like a test from a party with no involvement in the later work, we’re happy for you to arrange one.
Do you test before carpet?
Usually it’s not needed. Carpet is far more tolerant of slab moisture than timber, hybrid or vinyl. We’ll tell you if we think your situation is different.
What areas do you cover?
Brisbane, Logan, Ipswich, Moreton Bay, the Gold Coast and the Sunshine Coast. There’s no travel charge within 100 km of our Underwood base; further out, any travel is included in your fixed price.
Ready to book a moisture test?
Tell us about the slab and we’ll call you within one business day with a fixed-price quote. No travel charge within 100 km of Underwood.